| |
| |
KONTRAKTOR
KONTRAK KERJA SAMA |
| |
| |
| |
|
|
| |
|
Andrew Harber
|
|
(General Manager)
|
| |
| |
| |
Agus Susanto
|
: Finance Manager |
| |
Bambang Yosaatmadja
|
: General Affairs Manager |
| |
Bob Mcken
|
: Drilling Manager |
| |
|
Plaza Great River 8th floor, Jl. H.R Rasuna Said Kav. X-2 No.1, Jakarta 12950
|
|
|
| |
Phone |
:
(62-21) 526.2611
|
| |
Fax |
: (61-21) 526.2622; (62-21) 5262644 |
| |
Email |
: |
| |
Telex |
:
|
| |
INFORMASI KKKS |
| |
| Lapangan |
: |
N/A |
| |
|
|
| Daerah Operasi |
: |
Blok Blora (Jawa Tengah/Jawa Timur); Blok Banyumas (Jawa Tengah / Jawa Barat); Blok Sareba (Irian Jaya Barat) |
| |
|
|
| Shareholders |
: |
Lundin Blora B.V.; CNOOC Blora Ltd.; Lundin Banyumas B.V.; ConocoPhillips (Banyumas) Ltd.; Lundin Sareba B.V. |
| |
|
|
| Penemuan / Pengembangan Lapangan Baru |
: |
N/A |
| |
|
|
| Kapasitas Produksi |
: |
N/A |
| |
|
|
| Nilai Investasi |
: |
Blok Blora = USD 27 MM (10 tahun); Blok Banyumas = USD 23,65 MM (10 tahun); Blok Sareba = USD 27,7 MM (10 tahun) |
| |
|
|
| Karyawan |
: |
Nasional = 11; Ekspatriat = 1 |
|
| |
|
| |
|
|
| |
|
|